In order to give transparency and publicity to the R&D projects carried out and to collect subsidies for the preparation of new projects, Neoenergia discloses below the balance of its R&D account and the summary of the projects developed in recent years for Generation and Transmission. ​

​​​​​​​​​​​tabela com valores












​                      
                     KNOW OUR RESEARCH & DEVELOPMENT PROJECTS                                        


 Accordion | 2020

 Accordion | 2019

 Accordion | 2016

​​1. PD-0064-0002/2009​​ - Methodology Proposal for Monitoring and Evaluation of Greenhouse Effect Gases in Reservoirs of Brazilian Hydroelectric Power Plants._Company of the financing group - ITAPEBI.

2. PD-0453-0008/2011​ - Development of a drying module for powered transformers through dehydrated nitrogen atmosphere._ Companies from the financing group - ITAPEBI, BAGUARI, AFLUENTE G and AFLUENTE T.

3. PD-0453-0009/2011​ - Development of a Project for Application of Nanotechnological Ink in Electrical Insulators, aimed at Fault Mitigation._Company of the financing group - ITAPEBI, BAGUARI, AFLUENTE G, AFLUENTE T.

 Accordion | 2015

4. PD-0453-0006/2011 - Development of an Experimental Power Transformer Prototype using the Magnetic Flow of Transmission Lines to Transform Electric Energy._ Companies of the financing group - ITAPEBI, AFLUENTE T AFLUENTE G, BAGUARI.

5. PD-0453-0007/2011​ - Development of Unmanned Air Vehicle for Multi-Inspection._Companies of the financing group - ITAPEBI, AFLUENTE T AFLUENTE G, GENERATION CIII.

6. PD-0453-0011/2012 - First unit of a series of Environmental solution for lubricant oil spills from hydraulic systems of power generation plants._ Companies from the financing group - ITAPEBI, AFLUENTE G, AFLUENTE T, BAGUARI, GENERATION CIII.​

7. PD-0453-0013/2012​ - Pioneer Batch of Fault Detection Equipment for Power Transformers._ Companies from the financing group - ITAPEBI, TERMOPE, ENERGY WORKS and CAPUAVA.

8. PD-2290-0031/2010 - Development of a converter composed of hardware and software for integration of the power plant protection system according to IEC 61850._Company of the financing group - TERMOPE.

9. PD-2290-0034/2010 - TermoPE solar energy nighttime lighting system with reduction of losses in the static converter._Company of the financing group - TERMOPE.​​

10. PD-2290-0035/2010 - Study of biofouling and methodologies for physical control of fouling development in the Termopernambuco piping system. - Financing group company - TERMOPE.

11. PD-2290-0036/2010 - Desenvolvimento de aditivo nanoestruturado anticorrosão para tintas aplicadas em equipamentos e estruturas de termoelétricas localizadas em regiões marítimas._Empresa do grupo financiadora - TERMOPE.

12. PD-2290-0040/2010 - Development of a microalgae bioreactor system for CO2 sequestration and production of biodiesel oil integrated into a natural gas generator group. Company of the financing group - TERMOPE.

13. PD-2290-0044/2012 - Social and environmental responsibility of TermoPE in the process of installation of a pioneer batch of artificial reefs in the coast of Pernambuco._Company of the financing group - TERMOPE.​

14. PD-2290-0045/2012​ - First unit of the Series of Integrated Resource Management System and Energy Solutions in Isolated Systems with Implementation of Bottle-type Biodigestor._Company of the financing group - TERMOPE.

15. PD-2290-0048/2012 - Pioneer Batch of the Condition Monitoring System of Engine Auxiliary Systems through Electric Signature analysis._Company of the financing group - TERMOPE.

16. PE-0387-​0308/2009 - Methodology for Cost Allocation of the Transmission System._Company of the financing group - ITAPEBI.

 Accordion | 2014

17. PD-0453-0012/2012 - First unit of the Series of the Hydrogenerator Predictive Maintenance System._Company of the financing group - ITAPEBI.

18. PD-2290-0032/2010 - Development of First unit of the Series of Fault Detection Equipment in Power Transformers._Companies of the financing group - ITAPEBI and TERMOPE.

19. PD-2290-0033/2010 - Pioneer Batch of the Condition Monitoring System of Engine Auxiliary Systems through Electric Signature analysis._Company of the financing group - TERMOPE.

20. PD-2290-0037/2010 - Development of an absorbent material (perovskite type) for removal of diesel acidity._Company of the financing group - TERMOPE.​

21. PD-2290-0038/2010 - Development of a system for determination of optimal cleaning intervals for electrical insulation subjected to salt pollution._Company of the financing group - TERMOPE.

22. PD-2290-0042/2010 - Production of low cost biosurfactants for application in the removal of environmental contaminants generated by the petroleum and oil byproduct industry._Company of the financing group - TERMOPE.

23. PD-2290-0043/2010 ​- Treatment of marine region contaminated by oil byproducts using mixed compounds of bacteria, filamentous fungi and yeast. _Company of the financing group - TERMOPE.​

TO LEARN MORE ABOUT R&D PROJECTS IN DISTRIBUTION COMPANIES, PLEASE GO TO:​

Neoenergia Pernmabuco - www.neoenergiapernambuco.com.br​​​
Neoenergia Coelba - www.neoenergiacoelba.com.br
Neoenergia Cosern - www.neoenergiacosern.com.br​
Neoenergia Elektro - www.neoenergiaelektro.com.br​​​​​
Neoenergia Brasília - www.neoenergiabrasilia.com.br​​​​​

Related information