Neoenergia | Potiguar Sul Power Transmission S.A. is a privately held company, wholly controlled by the Neoenergia Group. Founded on August 13, 2013, the company is responsible for the implementation, operation and maintenance of Neoenergia'sfirst 500 kV power transmission line. The term of granting the service is 30 years.
See potiguar Sul's assets, which are part of the basic network:
TRANSMISSION LINES OF 500 kV
Campina Grande III - Ceará - Mirim II - C2
HISTORY OF THE ENTERPRISE
Potiguar Sul was created after Neoenergia won Lot G of the ANEEL 001/201/2013 transmission auction. The project consists of the construction, operation and maintenance of circuit 2 of the 500kV Transmission Line with connection in the Campina Grande III substations, in Paraíba and Ceará-Mirim II, in Rio Grande do Norte, totaling approximately 190 km of line and passing through 25 municipalities. Its purpose is to drain wind generation from the 2011 alternative source reserve energy auction, located in Rio Grande do Norte. This venture went into commercial operation on November 7, 2016.
PROJECTS IN OPERATION





PROJECTS UNDER CONSTRUCTION