18/07/2025
News
FreeMarker syntax is invalid.
Failed to "?eval" string with this error:
---begin-message---
Syntax error in ?eval-ed string in line 1, column 69:
Lexical error: encountered "u" (117), after "\"Neoenergia e COB impulsionam movimento \\".
---end-message---
The failing expression:
==> rootElement.selectSingleNode("//dynamic-element[@field-reference='banner_image']").element("dynamic-content").getText()?eval [in template "template_id" at line 10, column 22]
----
FTL stack trace ("~" means nesting-related):
- Failed at: bannerImageObj = rootElement.selectSi... [in template "template_id" in macro "getValues" at line 10, column 5]
- Reached through: @getValues item=item [in template "template_id" in macro "neoLatestsNewsItem" at line 43, column 3]
- Reached through: @neoLatestsNewsItem item=item [in template "template_id" at line 61, column 9]
----
Failed to "?eval" string with this error:
---begin-message---
Syntax error in ?eval-ed string in line 1, column 69:
Lexical error: encountered "u" (117), after "\"Neoenergia e COB impulsionam movimento \\".
---end-message---
The failing expression:
==> rootElement.selectSingleNode("//dynamic-element[@field-reference='banner_image']").element("dynamic-content").getText()?eval [in template "template_id" at line 10, column 22]
----
FTL stack trace ("~" means nesting-related):
- Failed at: bannerImageObj = rootElement.selectSi... [in template "template_id" in macro "getValues" at line 10, column 5]
- Reached through: @getValues item=item [in template "template_id" in macro "neoLatestsNewsItem" at line 43, column 3]
- Reached through: @neoLatestsNewsItem item=item [in template "template_id" at line 61, column 9]
----
Editorials
Content with Notícias Institucionais .
16/07/2025
Neoenergia and Nexus Ligas sign 10-year wind power self-production agreement
16/06/2025
Neoenergia recycles 34 tons of photovoltaic modules from a solar park in Paraíba
03/12/2024
Neoenergia wins Aberje 2024 Award in the National Events Category
13/09/2023
Brazil Windpower 2023: social responsibility project at the Neoenergia Renewable Complex is a model for the sector
08/08/2023
Projeto de regulagem de tensão é desenvolvido no Complexo Renovável Neoenergia, na Paraíba
12/06/2023
Neoenergia innovates in the inspection and maintenance of wind blades with the SmartBlade project
23/03/2023
Complexo Renovável Neoenergia pode evitar emissão de 100 toneladas de CO2 por ano
22/03/2023
Complexo Renovável Neoenergia: Brasil tem o primeiro complexo de geração associada de energia
28/02/2023
Neoenergia's wind and solar generation grows 70% in 2022
Neoenergia Institutional Communication
Press Relations Management
Rodrigo Carvalho, Aline Garrido and Annelise Pereira
rodrigo. carvalho@neoenergia.com
aline.ga rrido@neoenergia.com
annelise.pereira@neoenergia.com
Neoenergia Press
(Holding, Generation, Transmission and Commercialization)
Adriana Moreira
adriana.gmoreira@neoenergia.com
imprensa@neoenergia.com
(21) 99697 5659
Press Distributors
Neoenergia Coelba
Arthur Rios e Carla Jesus
imprensa.coelba@neoenergia.com
André Albuquerque
imprensa.pe@neoenergia.com
Arthur Rios e Carla Jesus
imprensa.coelba@neoenergia.com
(71) 3370-5899
Neoenergia PernambucoAndré Albuquerque
imprensa.pe@neoenergia.com
(81) 99399 4143
Neoenergia Cosern
Paulo Araújo e Ricardo Araújo
imprensa.cosern@neoenergia.com
(84) 99424 9938
(84) 99452 0294
Neoenergia Elektro
Tatiana Martinelli
Carlos Eduardo Cândido
imprensa.bsb@neoenergia.com
(61) 99148 5379
Tatiana Martinelli
imprensa.elektro@neoenergia.com
(19) 99657 1626
Carlos Eduardo Cândido
imprensa.bsb@neoenergia.com
(61) 99148 5379