- Products and Solutions

“Energia do Futuro” Project installs ten thousand smart meters in Atibaia (SP)
The new meters will inform Elektro about any energy outage in an specific household so that the company will be able to take action, preventing the customer from having to contact the distributor, as well as it will provide information for customers to actively manage their consumption. Installation takes about 30 minutes and the service has no cost to customers.
The first points of the pioneering 4G telecommunications network in South America are already installed. The Long Term Evolution (LTE) network will connect equipment allowing automation through real-time information exchange.
“Through innovation, Neoenergia Group continues to influence the future of the country. We will transform the way the public utilities relate to customers, anticipating needs, customizing service, all based on a lot of respect", says Heron Fontana, Neoenergia 's Smart Grids superintendent.
News
Failed to "?eval" string with this error:
---begin-message---
Syntax error in ?eval-ed string in line 1, column 69:
Lexical error: encountered "u" (117), after "\"Neoenergia e COB impulsionam movimento \\".
---end-message---
The failing expression:
==> rootElement.selectSingleNode("//dynamic-element[@field-reference='banner_image']").element("dynamic-content").getText()?eval [in template "template_id" at line 10, column 22]
----
FTL stack trace ("~" means nesting-related):
- Failed at: bannerImageObj = rootElement.selectSi... [in template "template_id" in macro "getValues" at line 10, column 5]
- Reached through: @getValues item=item [in template "template_id" in macro "neoLatestsNewsItem" at line 43, column 3]
- Reached through: @neoLatestsNewsItem item=item [in template "template_id" at line 61, column 9]
----