Comprising Caetité 1, 2 and
3, Caetité Complex is located in the city of Caetité, in Bahia. Its
installed capacity amounts to 90MW, distributed among the three farms, with 15
wind turbines each.
Energy produced in the
Complex is delivered to the National Interconnected System (SIN).
Caetité Complex in
perfectly integrated with the environment and local population, as social and
environmental responsibility is a highly relevant issue for Neoenergia Group.
In addition, the generation of clean and renewable energy in the semiarid area
of Bahia contributes to the region development. The region has become a
national reference cluster in renewable energy because of its wind power
potential.