- Products and Solutions

Neoenergia resumes special scheme in the second round of elections to maintain continuous energy supply
Distributors maintain preventive protocols, reinforce controllers structure and number of professionals in next Sunday's vote (30)
Neoenergia's distributors resumed preventive action to ensure the quality of the power supply during the second round of elections, October 30. The special scheme includes inspection of the entire electrical network, in the electrical circuits of the polling and transmission sites.
The five concessionaires – Neoenergia Brasília, Neoenergia Coelba, Neoenergia Cosern, Neoenergia Elektro and Neoenergia Pernambuco – are with reinforced teams to act on the ballot, as well as electoral notatories and polling centers. Technicians performed preventive and corrective maintenance in the circuits of all states served by distributors. The inspections, on the other, focused on the lines and networks that supply the buildings of electoral zones and regional electoral courts. In the Federal District, Neoenergia Brasília carried out the inspection of the installations and electrical circuits that serve the Superior Electoral Court (TSE).
The special operation for the election period is added to the continuous maintenance actions already carried out by the company in the concession areas. In this way, teams are able to assess the specific needs of polling places and perform services in advance in order to ensure a quality and reliable power supply.
News
2025-07-01
Carbon2Nature Brasil anuncia parceria inédita com Biomas em projeto de restauração de floresta nativa no país
2025-06-25
Pedro Azagra é o novo CEO do Grupo Iberdrola
2025-06-24
São João 2025: campanha da Neoenergia alerta sobre os perigos de soltar balões em festas juninas
2025-06-17
Neoenergia é a marca mais valiosa do setor elétrico brasileiro
2025-06-16