11/03/2025
News
FreeMarker syntax is invalid.
Failed to "?eval" string with this error:
---begin-message---
Syntax error in ?eval-ed string in line 1, column 69:
Lexical error: encountered "u" (117), after "\"Neoenergia e COB impulsionam movimento \\".
---end-message---
The failing expression:
==> rootElement.selectSingleNode("//dynamic-element[@field-reference='banner_image']").element("dynamic-content").getText()?eval [in template "template_id" at line 10, column 22]
----
FTL stack trace ("~" means nesting-related):
- Failed at: bannerImageObj = rootElement.selectSi... [in template "template_id" in macro "getValues" at line 10, column 5]
- Reached through: @getValues item=item [in template "template_id" in macro "neoLatestsNewsItem" at line 43, column 3]
- Reached through: @neoLatestsNewsItem item=item [in template "template_id" at line 61, column 9]
----
Failed to "?eval" string with this error:
---begin-message---
Syntax error in ?eval-ed string in line 1, column 69:
Lexical error: encountered "u" (117), after "\"Neoenergia e COB impulsionam movimento \\".
---end-message---
The failing expression:
==> rootElement.selectSingleNode("//dynamic-element[@field-reference='banner_image']").element("dynamic-content").getText()?eval [in template "template_id" at line 10, column 22]
----
FTL stack trace ("~" means nesting-related):
- Failed at: bannerImageObj = rootElement.selectSi... [in template "template_id" in macro "getValues" at line 10, column 5]
- Reached through: @getValues item=item [in template "template_id" in macro "neoLatestsNewsItem" at line 43, column 3]
- Reached through: @neoLatestsNewsItem item=item [in template "template_id" at line 61, column 9]
----
Editorials
Content with Notícias Institucionais .
29/01/2025
Neoenergia and CCR Group conclude wind power self-production agreement
11/11/2024
CCR Group and Neoenergia sign wind power self-production contract in the Northeast
01/11/2024
Ordinance authorizes decarbonization project in Fernando de Noronha by Neoenergia
24/10/2024
BWP 2024: Neoenergia believes the country has the potential to develop offshore wind in the long term
23/10/2024
BWP 2024: Neoenergia believes that wind energy is fundamental to the country's fair and affordable energy transition
23/10/2024
BWP 2024: Neoenergia's social initiatives strengthen the company's relationship with communities
26/06/2024
Neoenergia and the Government of the EC sign a memorandum for the development of offshore wind power generation studies in the state
27/03/2024
Neoenergia instala sistema flutuante pioneiro no Brasil para estudos de medição eólica offshore
26/03/2024
Brazil Offshore Wind Summit 2024: Neoenergia and the government of Rio de Janeiro sign a memorandum for offshore wind energy development studies in the state
Neoenergia Institutional Communication
Press Relations Management
Rodrigo Carvalho, Aline Garrido and Annelise Pereira
rodrigo. carvalho@neoenergia.com
aline.ga rrido@neoenergia.com
annelise.pereira@neoenergia.com
Neoenergia Press
(Holding, Generation, Transmission and Commercialization)
Adriana Moreira
adriana.gmoreira@neoenergia.com
imprensa@neoenergia.com
(21) 99697 5659
Press Distributors
Neoenergia Coelba
Arthur Rios e Carla Jesus
imprensa.coelba@neoenergia.com
André Albuquerque
imprensa.pe@neoenergia.com
Arthur Rios e Carla Jesus
imprensa.coelba@neoenergia.com
(71) 3370-5899
Neoenergia PernambucoAndré Albuquerque
imprensa.pe@neoenergia.com
(81) 99399 4143
Neoenergia Cosern
Paulo Araújo e Ricardo Araújo
imprensa.cosern@neoenergia.com
(84) 99424 9938
(84) 99452 0294
Neoenergia Elektro
Tatiana Martinelli
Carlos Eduardo Cândido
imprensa.bsb@neoenergia.com
(61) 99148 5379
Tatiana Martinelli
imprensa.elektro@neoenergia.com
(19) 99657 1626
Carlos Eduardo Cândido
imprensa.bsb@neoenergia.com
(61) 99148 5379